idensal
.
solar configurator
Configure
Projects (0)
Project details
Project name
Client
Site postcode
Site type
Office
Supermarket
School
Depot
Hospital
Leisure
Public car park
Carport configuration
Number of parking bays
Carport type
Type 1
South
Type 2
South
Type 3
East-West
Type 4
South
Panel family
630W (default)
650-670W (advanced)
700-725W (advanced)
Electrical options
EV chargers
Charger model
WallPod 7.4kW
QUBEV Smart 7.4kW
Quantum 2x7.4kW
Quantum 1x22kW
Quantum 2x22kW
Battery objective
None
Self-consumption
EV charging support
Peak shaving
Export limit support
Annual consumption (kWh)
Export limit (kW)
Optional upgrades
Exposed site (+10%)
2.7m clearance
Corrosion protection
C3 Standard (no surcharge)
C4 High corrosion (+£75/bay)
C5 Very high corrosion (+£150/bay)
▼
Advanced / internal settings
New project
Requested: 40 bays → Structural package: 40 bays (P10+P20+P10)
— · Office · Type 2 south
Panels
220
UKSOL 630W
DC capacity
138.6 kWp
5.5 panels/bay
Est. annual gen
124,740 kWh
900 kWh/kWp
Steel weight
~14,415 kg
1x 40' container
Lower cost
Structure + PV + inverter
£100,754
£2,519 / bay
Steel structure
£76,000
Panels (220x)
£18,274
Inverter
£6,480
EV chargers
—
Battery
—
Engineering
—
✓
Steel kit DDP
✓
Panels
✓
Grid-tie inverter
—
No EV chargers
—
No battery
—
No engineering
Recommended
+ EV charging + engineering
£104,999
£2,625 / bay
Steel structure
£76,000
Panels (220x)
£18,274
Inverter
£4,725
EV chargers
—
Battery
—
Engineering
£6,000
✓
Steel kit DDP
✓
Panels
✓
Grid-tie inverter
✓
UK structural engineering
✓
Battery-ready conduit
Future-ready
+ battery + enhanced EV
£104,999
£2,625 / bay
Steel structure
£76,000
Panels (220x)
£18,274
Inverter
£4,725
EV chargers
—
Battery
—
Engineering
£6,000
✓
Steel kit DDP
✓
Panels
✓
Grid-tie inverter
✓
UK structural engineering
Internal margin analysis — recommended package (hidden from client)
Steel: buy £21,080 / sell £76,000
72.3% margin
Panels: buy £13,053 / sell £18,274
28.6% margin
Inverter: buy £3,500 / sell £4,725
25.9% margin
Recommended total margin
£61,366 (58.4%)
⚠
Export limit unknown. DNO application required.
⚠
Annual consumption unknown. Self-consumption estimate indicative.
⚠
Panel price not confirmed — using interpolated estimate (£59.33).
⚠
Concept estimate only. Subject to structural engineering, DNO/electrical review, supplier confirmation.
⚠
Excludes: foundations, civils, installation, DNO application unless stated.
Save project
Generate client PDF
Client view